Used Self Erect Cranes North Carolina - The tower crane's base is usually bolted to a large concrete pad which provides really crucial support. The base is attached to a tower or a mast and stabilizes the crane which is affixed to the inside of the structure of the building. Usually, this attachment point is to an elevator shaft or to a concrete lift.
Usually, the mast is a triangulated lattice structure measuring 0.9m2 or 10 feet square. The slewing unit is connected to the very top of the mast. The slewing unit is made of a gear and a motor that allows the crane to rotate.
Tower cranes are able to have a maximum unsupported height of 80m or 265 feet. The tower crane's maximum lifting capacity is sixteen thousand six hundred forty two kg or 39,690 lbs. with counter weights of 20 tons. Furthermore, two limit switches are utilized in order to ensure the operator does not overload the crane. There is even another safety feature known as a load moment switch to make certain that the operator does not surpass the ton meter load rating. Finally, the tower crane has a maximum reach of 70 meters or 230 feet.
Because of their extreme heights, there is a science involved to erecting a crane. The stationary structure will at first have to be transported to the construction location by utilizing a big tractor-trailer rig setup. Next, a mobile crane is utilized in order to assemble the machine portion of the jib and the crane. After that, these parts are attached to the mast. After that, the mobile crane adds counterweights. Crawler cranes and forklifts may be some of the other industrial machines that is utilized to erect a crane.
Mast extensions are added to the crane when the building is erected. This is how the height of the crane could match the building's height. The crane crew uses what is referred to as a top climber or a climbing frame that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. When complete, the slewing unit can detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an additional 6.1m or 20 feet. Then, the operator of the crane utilizes the crane to insert and bolt into position one more mast part piece.
Self Erect Cranes PDF